The Borges Real Estate Team
The Borges Real Estate Team
Mid-century Pasadena home with wide eaves and glass walls
Buyer Resources - California

Can I Remodel a Mid-Century Home Without Losing Its Value?

November 17, 20268 min readJustin Borges

Usually, yes, whether you own it or are about to buy it: keep the roofline, wide eaves, glass and visible structure that buyers of these houses look for, and check the property’s historic status and permit history before committing to the work. I’m Justin Borges, and this page does not put a dollar or percent value on any change; how a remodel affects price depends on the house and the market.

The useful question is how your plan meets the particular house. I start by looking at what is visible, then work through the records and the scope with the people who can evaluate it. Here is how I would approach that process before making a commitment.

Ready to move forward? Let's talk.

What features should you keep in view?

Pasadena’s Historic Context Statement public review draft identifies simple geometric forms and expressed wood or steel post-and-beam construction as features of Mid-Century Modern design. It describes flat or low-sloped roofs, wide overhanging eaves, and exterior panels of wood, plaster, brick, patterned concrete block or stone. It also names flush metal-frame fixed or sliding windows, sliding doors and clerestory windows. SurveyLA describes the relationship between posts, beams, expansive glass and open plans.

I look at the whole composition and which materials remain visible. A plan that treats each surface separately can miss how those pieces relate to each other.

For a closer look at the style itself, see my guide to how to spot a mid-century home.

If you want to walk through a particular property, call me at (323) 673-2597 and we can discuss what you are considering.

The city’s draft dates the Mid-Century Modern sub-theme to 1945-1968.

What can you update while keeping the design legible?

I start with changes that leave the defining composition in place: updating cabinets or countertops, painting, or replacing a system. I compare a new finish with the materials already there and check whether a distinctive surface will remain visible.

For changes to the defining composition, I want drawings showing existing and proposed conditions and a review of the scope with the city. I also want a qualified professional to understand which elements carry loads before anyone treats a wall or beam as decorative.

In San Rafael, I pay attention to how a hillside approach and slope meet the house. In Linda Vista, I look at where a glass wall faces a neighbor and where a wide eave meets the street frontage. Those views shape the questions I put on the drawings. For a house elsewhere in the San Gabriel Valley, I start with that city’s own planning records.

Ready to move forward? Let's talk.

How do you check historic status in Pasadena?

Search the specific address in Pasadena’s Historic Resources Database or designated-properties lookup, or contact Pasadena Current Planning. Do not infer designation from the style or neighborhood. My guide to finding out whether a Craftsman is landmarked or in a historic district walks through the lookup; the address check matters here too.

If the address is designated, I put the proposed exterior work alongside the designation record before settling on a design. My guide to choosing an agent for a mid-century purchase covers the district review rule and choosing representation.

For a district remodel, street-visible exterior alterations require a Certificate of Appropriateness before a building permit. A building permit can still be needed for work exempt from historic review.

The city-hosted 2021 code copy lists district exemptions outside the Central District, including routine maintenance and reroofing unless the material changes. Confirm the current text with Current Planning.

To discuss the records for a house you are considering, text me with the property details.

Designation is not the only reason to ask about review. Pasadena Municipal Code 17.62.080 calls for a Historic Resource Evaluation for demolition or a major project affecting a building at least 45 years old. The city-hosted 2021 code copy lists exceptions for a recent evaluation or survey and a city-prepared evaluation under CEQA. If the evaluation finds the house eligible, city staff review major alterations and the Historic Preservation Commission reviews demolition, so I build that review into the plan; under the city-hosted 2021 code copy the applicant pays the professional services cost.

I check title for a Pasadena Mills Act Historic Property Contract and review its obligations before the buyer commits to a scope. It transfers to the next owner, and work affecting historic features inside or out must meet the Secretary of the Interior’s Standards for Rehabilitation and receive a Certificate of Appropriateness. The contract renews annually; an owner seeking non-renewal must notify the city at least 90 days before the renewal date, and the contract remains in effect for the balance of its term. The city requires self-certification and annual inspections; breach can bring a cancellation fee of 12.5% of the assessor’s current value. The 2026 application window is closed.

Ready to move forward? Let's talk.

What should you check in the permit history?

After the historic lookup, I use Pasadena Permit Center Online’s Research Property and Search for a Permit tools to pull the address’s history. I compare the permits with the house before treating an addition or alteration as settled.

The city’s permit-exempt list includes painting and tiling that is not part of an accessible route. An exemption does not authorize a code violation, and a zoning permit may still be required. I separate finish work from changes to structure or services in the scope. California requires a permit when an HVAC unit is replaced or altered.

The seller’s Transfer Disclosure Statement asks about additions, structural modifications or other alterations or repairs made without necessary permits. I read that answer alongside the records and what we see. A covered agent also has a visual inspection duty under California Civil Code 2079.

Before close of escrow, the seller must obtain a Pasadena Presale Certificate of Completion or Certificate of Inspection. I review which certificate applies and whether a Transfer of Responsibility is proposed.

For help organizing these questions before an offer, call me at (323) 673-2597 so we can discuss the property.

Before disturbing suspect materials, I put asbestos assessment on the remodel checklist.

Ready to move forward? Let's talk.

How should you plan before committing?

I want the investigation to follow the scope of the work, not just the listing description. We write down what the buyer wants to retain and change. If a permit record does not show an addition, I first ask the seller for permit paperwork, then request public records from Pasadena. I bring a contractor in to evaluate the addition and raise the unresolved issue before the contingency period ends. A missing record is a question to investigate, not proof by itself that the work was unpermitted.

I send the house to an inspector and ask the buyer to share the remodel plans as well. My guide to what a general inspector checks explains that inspection. Where the intended work touches the frame or glass, I recommend adding a contractor or structural specialist to evaluate the scope. Their input can turn a broad idea into questions that can be put to the city.

If you already own the house, I would follow the same historic review and permit path before starting work: check whether the age and scope trigger a Historic Resource Evaluation, whether district work needs a Certificate of Appropriateness, and whether Building and Safety requires a permit. I would budget time for the applicable review described above.

If you already have a house in mind, text me and tell me what you hope to change.

Before the contingency period ends, I compare the designation record, permit history, seller’s Transfer Disclosure Statement answer and title with the inspection findings. For a house built before 1978, federal lead rules generally treat it as target housing, subject to stated exceptions. Before the buyer becomes obligated under a purchase contract, the seller must allow a 10-day period for a lead inspection or risk assessment unless both parties agree in writing to a different period; the buyer may waive the opportunity in writing.

What do buyers look for on a tour?

When I walk a mid-century home with a buyer, I check what the glass faces and how it connects the room to the outside, where the roof projects past the wall, and how the glazing meets the visible structure. Before discussing a design, I photograph the street elevation, roof edge and junctions around the glass.

I also look at the approach from the street. A broad eave can frame the entry, while a hillside lot changes the way a buyer moves from the street into the house. For a neighborhood-specific look, see my guide to Hastings Ranch.

Ready to move forward? Let's talk.

Frequently asked questions

Should I replace original windows just because I want a different look?

No. I start by comparing the proposed windows with the originals. In the city-hosted 2021 code copy, for a designated or eligible historic property, replacement windows matching the size, design and materials of the existing or original windows are a minor project, while changing window materials, muntin patterns or opening sizes on a street-facing elevation is a major project. The city amended these definitions in 2022, so confirm the current text with Pasadena Current Planning before you plan window work.

Can I plan a kitchen update before I buy?

Yes. I separate cabinets and counter tops, which are on Pasadena’s permit-exempt list, from plumbing, electrical or mechanical changes, which are not covered by that finish-work exemption.

Does an older house automatically have asbestos?

No. EPA lists vinyl floor tile, sheet-flooring backing and adhesives, textured paint and patching compounds among materials that may contain it. I arrange for a trained and accredited asbestos professional to sample suspect material before it is disturbed.

What if the seller does not know about an alteration?

I investigate an unknown alteration by requesting the Pasadena permit record and raising any gap before the contingency period ends.

Can I ask the city about a preliminary idea?

Yes. I bring the address, a description of the work and drawings showing existing and proposed conditions to the appropriate city office.

To talk through your next step, text me with your questions.

Ready to move forward? Let's talk.

Sources

For a conversation about your plans, call me at (323) 673-2597.

Justin Borges
Your Agent

Justin Borges

Team Lead, The Borges Real Estate TeamDRE #01940318

13+
Years
$210M+
In Sales
5-Star
Rated

With over 13 years in Southern California real estate, Justin specializes in probate sales, trust properties, and character homes.

Trust Sales Specialist

Ready to move forward? Let's talk.

Trust sales are one of my specialties. Whether you are in Pasadena, Glendale, Arcadia, or anywhere in LA County, I am ready to help you navigate this clearly and close with confidence.

Can I Remodel a Mid-Century Home Without Losing Its Value? | The Borges Real Estate Team