The Borges Real Estate Team
The Borges Real Estate Team
Craftsman bungalow with a welcoming porch and garden in Pasadena
Seller Resources - California

How Should I Prepare and Price a Craftsman Bungalow to Sell?

November 7, 20269 min readJustin Borges

I'm Justin Borges, a licensed California real estate salesperson (CA DRE #01940318) with eXp Realty of Greater Los Angeles. I would prepare your Craftsman bungalow by cleaning and repairing what is there, improving the light, and keeping its original woodwork, built-ins and windows visible. I would price it from recent comparable sales matched for era, size, condition and street, then settle on an exact price with you after I walk through the house, rather than relying on a generic price per square foot.

A thoughtful sale starts with understanding the house in front of us: its character, the work it needs and the records that explain what has changed. The plan should help a buyer see both the appeal and the condition clearly. It cannot guarantee a price, a quick sale or any particular outcome.

Ready to move forward? Let's talk.

How do comparable sales translate into an asking price?

I start with recent closed sales and examine whether each house is truly useful as a comparison. A Craftsman with a similar era and footprint on a comparable street may still differ in foundation condition, alterations, usable space or the presence and condition of original details. I would inspect the available records and photographs and explain where a sale fits and where it falls short. For example, if a comparable bungalow has an enclosed porch and yours retains its open porch, I would examine the permitted space and condition of each before deciding whether the difference supports an adjustment. I would explain the evidence for any adjustment rather than assign an unsupported premium. Bring the comparable sales to our discussion, or call me at (213) 262-5092 to review them.

Price per square foot can be a starting reference, but it does not explain the condition of original windows, the quality of an addition or the relationship between a porch and its street. Nor does a listing's asking price establish what a buyer actually paid. We will compare the evidence, the condition of your house after the walk-through and your priorities, then decide on an asking price together.

In my judgment, starting too high can cost leverage during the first week: visitors may compare the asking price with alternatives and move on, leaving us to reconsider the price after that initial exposure. I would review showing feedback and competing listings after that initial exposure and discuss whether the asking price needs adjustment. Disclosures and inspection reports also shape expectations. A buyer who sees the character and understands known work can evaluate the house with a clearer picture, even though that buyer makes their own decision.

For context about our work, our team's own 89 closed sales averaged 103.6% sale-to-list and had a 16-day median time on market, according to our MLS export dated 2026-10-29. These are team results across those closed sales, not Pasadena or Craftsman statistics, and they do not promise your result. To discuss the evidence for your home, text me.

Ready to move forward? Let's talk.

What should I inspect before deciding what to fix?

Start with a walk-through with me and, when appropriate, a pre-listing inspection. Look at the foundation, roof, plumbing and electrical systems, and consider a structural pest inspection. The point is to identify questions early enough to make choices, not to assume that an older house is defective or that an inspector will find every issue. I would ask the inspector to distinguish an observed condition from something that needs a specialist's evaluation.

Gather prior inspection reports, repair invoices, permits, plans and warranties you have. Note when a leak appeared, what was done and whether it returned. If a window sticks or a floor slopes, describe what you have observed rather than guessing at the cause. A roofer, electrician, plumber, foundation specialist or pest professional can investigate within their expertise. The resulting information can shape the work plan and the disclosures, even if you decide against a repair.

Under California Civil Code 1099, checked 2026-11-06, a structural pest report is delivered before transfer when a report or certification is a condition of the contract or financing. It is not a requirement that every seller obtain one. Bring the inspection reports and repair records to our walk-through. If you want to talk through the inspection choices, call me at (213) 262-5092.

Ready to move forward? Let's talk.

Which repairs and cosmetic work should come first?

After the inspection, I would sort the list by what needs professional attention, what a visitor will encounter immediately and what should be left alone. A loose porch rail, a door that will not latch or an obvious leak deserves a clear plan. Ask the right professional to assess the issue, document any work and keep the report. If you elect not to repair something, we can discuss how to present the known condition accurately.

For presentation, clean the porch and entry, remove clutter from the approach and make sure the interior is well lit. A modest arrangement on the porch can show how it is used without hiding the columns or crowding the doorway. Inside, clear the built-in shelves enough for visitors to see their shape and craftsmanship. Open curtains where practical, clean the windows and let the woodwork frame the rooms.

Consider nowPause before changing
Cleaning, lighting and repairs to visible, documented defectsStripping or painting over original woodwork simply to list
Careful repair of a sticking original window after evaluationReplacing original windows before checking condition and city review
Removing clutter from built-ins and the entryRemoving built-ins or changing the porch to make the home look newer

Not every original feature is unpainted, and not every alteration needs to be reversed. I would rather understand what is present and its condition before proposing a large project. For a closer discussion, see our related question on whether to restore original features before listing. Keep a written repair list and the corresponding reports. To review your own list, text me.

Ready to move forward? Let's talk.

What does Pasadena require before escrow closes?

Before close of escrow, Pasadena requires the applicable Presale certificate. The city's Presale program, checked 2026-11-07, lists in-person fees of $29 for self-certification and $184 for inspection, plus processing fees. Our discussion of disclosing old wiring and plumbing covers the program in more detail.

Gather permits and compare them with the house before choosing a route. Bring the records to our walk-through, and call me at (213) 262-5092 if you would like help organizing the questions for city staff.

Ready to move forward? Let's talk.

Could an exterior change need historic review?

In Bungalow Heaven, street-visible changes to contributing houses can require review; Garfield Heights and Banbury Oaks have their own conservation plans. Before replacing street-facing windows or changing the porch, check whether the property is a designated historic site or lies in a landmark district. Pasadena's Historic Preservation page, checked 2026-11-05, points owners to Map My Neighborhood and the California Historical Resources Inventory Database, known as CHRID. Turn on the Historic Properties layer in Map My Neighborhood and compare the information with CHRID.

The city's designation guidance, checked 2026-11-05, describes Certificate of Appropriateness review for work on designated properties, including street-visible exterior alterations in landmark districts, before a building permit. For an older house that is not designated, ask Pasadena's Design & Historic Preservation Section whether review applies and whether the property may be eligible for designation. Do this before ordering work, and let the city determine the applicable process.

A map is a useful starting point, not a substitute for describing the actual project to staff. Our guide on finding out whether a Craftsman is landmarked or in a historic district provides a place to start. Bring the proposed project and property records to preservation staff. If you have a proposed change in mind, text me and we can discuss how it fits the sale plan.

Ready to move forward? Let's talk.

How should I handle lead and seller disclosures?

For pre-1978 housing, the EPA's lead disclosure rules, checked 2026-11-07, include a 10-day buyer opportunity for a paint inspection or risk assessment, subject to modification or waiver. The EPA Renovation, Repair and Painting program, checked 2026-11-05, addresses covered work disturbing painted surfaces. Our discussion of disclosing old wiring and plumbing covers lead disclosures in more detail.

The C.A.R. Transfer Disclosure Statement, checked 2026-11-07, addresses systems, significant defects and unpermitted alterations under California Civil Code 1102 et seq. Give buyers the information and reports you have, and ask an attorney about a specific legal question. Assemble the disclosure forms and available reports, then call me at (213) 262-5092 to organize what you know.

Ready to move forward? Let's talk.

What should I do each week before listing?

The sequence matters more than a rigid calendar. We can adjust it to the condition of the home, the professionals' findings and your plans.

  • First week: Walk through with me, gather records and arrange the inspections that fit the house. List known conditions and questions about the foundation, roof, systems and pests.
  • Next week: Review findings, check permits and Pasadena Presale eligibility, and ask preservation staff about any proposed exterior changes. Decide which repairs merit specialist estimates.
  • Following week: Complete the work you choose, retain documentation and prepare disclosures. Clean and stage the porch, entry and built-ins without obscuring their character.
  • Before launch: Walk through again, review comparable sales and agree on a price. Plan photographs that show the porch, window placement, woodwork and built-ins in context.

Use this first-week-to-launch sequence as a working schedule; repairs and city review can extend it. Our related questions on photographing and marketing a Craftsman, repair requests after inspection, and what Craftsman buyers weigh can help you prepare for the next decisions. The deliverable is a work list, disclosure folder and pricing review. If you want to map out your schedule, call me at (213) 262-5092.

Ready to move forward? Let's talk.

Questions sellers ask about Craftsman bungalows

Should I restore original Craftsman features before selling?

No, not automatically. I would clean and reveal the original features, then assess damage and check applicable preservation requirements before committing to restoration.

Does a Pasadena Craftsman need a Presale Certificate?

Yes. Before close of escrow, Pasadena requires the applicable Presale Certificate of Completion through self-certification or Certificate of Inspection through a city inspection.

How do I price a Craftsman when nearby sales look different?

Compare recent sales for era, style, size, condition and location, then adjust for supported differences. I give a price opinion after walking through your house and discussing the evidence with you.

For a plan tailored to your bungalow, text me.

Ready to move forward? Let's talk.

What else should I know before listing?

Do I have to disclose old wiring or plumbing?

Yes, disclose known conditions on the applicable forms and provide relevant reports. The C.A.R. Transfer Disclosure Statement addresses electrical and plumbing systems; ask an attorney about a specific legal question.

Should I get a termite inspection before listing?

Consider one after a walk-through. California Civil Code 1099 requires delivery of a structural pest report before transfer when the report or certification is a condition of the contract or financing; it does not require every seller to obtain one.

Can I replace the front windows before listing?

Yes, after checking their condition and whether the proposed work needs Pasadena preservation review. For a pre-1978 home, ask the contractor about applicable lead-safe requirements before painted surfaces are disturbed.

For help weighing your next step, call me at (213) 262-5092.

Ready to move forward? Let's talk.

Sources

For a walk-through and a conversation about your home, text me.

Justin Borges
Your Agent

Justin Borges

Team Lead, The Borges Real Estate TeamDRE #01940318

13+
Years
$210M+
In Sales
5-Star
Rated

With over 13 years in Southern California real estate, Justin specializes in probate sales, trust properties, and character homes. His expertise in 1031 exchanges and historic preservation has helped hundreds of clients navigate complex real estate transactions.

Trust Sales Specialist

Ready to move forward? Let's talk.

Trust sales are one of my specialties. Whether you are in Pasadena, Glendale, Arcadia, or anywhere in LA County, I am ready to help you navigate this clearly and close with confidence.

How Should I Prepare and Price a Craftsman Bungalow to Sell? | The Borges Real Estate Team